Project Methodology/Process
By supervising, directing & motivating teams of multi-discipline contractors & employees, We delivered projects against agreed scope, budget, schedule & customer expectations.
- Implement Project Management strategies from initiation to closure
- Monitoring project risks and identifying potential problems and proactively implement solutions
- Act promptly on issues that may impact operations.
- Providing strategic direction during the implementation stages.
- Managing client expectations by ensuring the delivery of the highest quality service
- Prompt action on client feedback.
- Monitoring staff & team performance.
Individual Theme based work process
NATURAL RESOURCES
Ground water & Surface Water- Gathering information regarding Water resources/Geology/Topography/Climate/Rainfall
- Evaluating present and future water needs
- Regularly reviewing Water resources
- Public and Agencies Involvement and discussions
- Protecting and enhancing Recharge conditions
- Feasibility Analysis
Project Execution
- Data collection and management
- Studying the Geology/Geomorphology/Lineaments/Climate/Rainfall
- Locating and identify water wells & Recharge Sources
- Collecting groundwater levels
- Collecting ground water and surface water quality data
- Analyzing ground water conditions
- Appraise groundwater and surface water use
- Prepare Thematic Maps and Charts
- Project future rates of extraction and reduction of groundwater and surface water levels
- Public and Local groups participation and discussing about use of groundwater and surface water
- Evaluating the quantity of water per person
- Developing Plan for Managing Water Supplies
- Estimating the Surface water (Reservoir, Ponds, Lakes Capacity) and Silting
- Planning for De siltation
- Investigation for Groundwater exploration
- Geology/Geophysical Surveys
- Pin pointing of Groundwater Source (Identification)
- Drilling
- Evaluating the Aquifer Characteristics (Pumping tests)
- Quality of Groundwater
- Final Reporting on Groundwater and Surface availability and Sufficing the needs
- Planning for Constructing Recharge Structures where ever necessary
- Water Contamination Studies
- Monitoring and Reviewing (Reengineering) existing Projects
Technologies & Tools used
- Remote Sensing (Satellite data interpretation)
- GIS
- Electrical Resistivity Surveys
- Water level Indicators
- Topographical Survey
- Handheld GPS
- Field data collection
- Collection of existing Land use /Land Cover (Agriculture, Wasteland, Built up, Forests, Water bodies etc.) data and reports
- Evaluating present and future Land use
- Change Detection Analysis (Monitoring of Land use)
- Public and Agencies Involvement and discussions
- Protecting Environmental factors (degradation of forests, increase of wastelands, drying of water bodies etc. impacting environmental concerns)
Project Execution
- Data collection and management
- Preparation of Digital Land use / Land cover Maps
- Calculation of Land Areas
- Change detection Analysis
- Public and Local groups participation and discussing about use of Land and environmental concerns
- Crop acreage estimations
- Evaluating utilization of wastelands, agriculture, Forest areas, depletion of water bodies, Irrigation facilities etc.
- Estimating and analyzing the demand for built up area versus population increase
- Projecting future trends
- Monitoring and Reviewing (Reengineering) existing Projects
Technologies & Tools used
- Remote Sensing (Satellite data interpretation)
- GIS
- Handheld GPS
- Field data collection
INFRASTRUCTURE
Utilities- Gathering required information about water/sewage/electrical/Gas utilities
- Evaluating present and future needs and facilities as per growth dynamics
- Planning, evaluating and executing project
Project Execution
- Data collection (plans, maps, reports) and management
- Preliminary study - Satellite data interpretation
- Preparation and updating Digital Water/Sewage, Electrical and Gas Facilities
- Field data collection (Meters/Transformers/Lines/Drains etc.)
- Total Station Survey and Fixing of Network
- Soil Testing (Physical & Chemical)
- Geophysical study for Subsurface Profile
- Evaluating effective utilization of facilities
- Impact study of Storm water/Wastewater etc.
- Estimating and analyzing the demand for Facilities as per projected increase of built up area
- Land Acquisition (Public and Local groups participation)
- Projecting future trends
- Monitoring and Reviewing (Reengineering) existing Projects
Technologies & Tools used
- Remote Sensing (Satellite data interpretation)
- GIS
- Handheld GPS
- Field data collection
- GPR/Electrical Resistivity Surveys
- Total Station Survey
- Gathering required information about Land, Soil, Water & Environmental factors
- Feasibility Study for Construction & Lay outs (Water, Soil, Land & Pollution Studies)
- Planning, evaluating and executing project
Project Execution
- Data collection (plans, maps, reports) and management
- Preliminary study - Satellite data interpretation
- GPS & Total Station Survey for 3D model of the area (Landscape )
- Soil Testing (Physical & Chemical) - Auger, Core drilling, CBR etc.
- GPR/Geophysical study for Subsurface Profile & Earth Resistance
- Environmental and Social Impact Studies (Feasibility of Location for Clear Environment)
- Pin Pointing Groundwater Resource, Drilling, Aquifer tests etc.
- Feasibility Report Generation
- Land Acquisition (Public and Local groups participation)
- Monitoring and Reviewing (Reengineering) existing Projects
Technologies & Tools used
- Remote Sensing (Satellite data interpretation)
- GIS
- Handheld GPS
- Field data collection
- GPR/Electrical Resistivity Surveys
- Total Station Survey
Projects Handled
- Bharat Oman Gas Pipeline Project - Godhra (MP) to Bina (MP) - about 280kms
- Mahankali High way Project (Roads & Bridges) - Nepal
- BSES Power Project (Roads, Towers, Buldings) - Samarlakota, Andhra Pradesh
- Feasibility Study for Land acquisition for MNC companies in Hyderabad, Noida, Faridabad etc.
- Soil Investigation for a Bridge near Puttaparti & Done.
- Soil Investigation & Earth Resistivity Study - High rise buildings - Hyderabad
- Determining Irrigable lands, Water availability, Agriculture water requirements
- Evaluating Impact on Soil, Water, Air, Plants & Local People
- Public and Agencies Involvement and discussions
- Effective Water usage (Water requirement, Water Conservation, Water quality control etc.)
- Project construction
Project Execution
- Data collection and management
- Preliminary Study - Satellite data Interpretation/ Fixing of Feasible alignment
- Study of Existing Land use, Forest Area, Archeological Structures, Water bodies, Utilities etc.
- Grid Survey of the Area - Generation of 0.5m contours
- Fixing of Irrigation Canal Network - From Main Distributory to Field channels
- Soil Investigation & Geophysical Surveys at Required Locations (Structures, Bridges etc)
- Design of Structures (HR, VRB, Falls etc.)
- Earth work Estimations
- Finalizing locations for dumping and equipment storage
- Reports Generation and Approvals from Department
- Preparing Land Acquisition cases through Public Participation
- Projecting future Irrigation needs
- Monitoring and Reviewing (Reengineering) existing Projects
Technologies & Tools used
- Remote Sensing (Satellite data interpretation)
- GIS
- Handheld GPS
- Field data collection
- GPR/Electrical Resistivity Surveys
- Total Station Survey